8 tonnes of blue metal dust were delivered in 3 batches and layed in the back garden in the last few weeks. The rain meant little progress on some weekends. More blue metal and blue metal dust are ordered. Retaining wall blocks were delivered this week. These blocks will sit on the leveled blue metal ground after trenches are digged and pipes layed for irrigation. Work is behind schedule this weekend as we lost a worker temporarily due to hang-over.